No products
The Visible and Invisible Cracking of Concrete...
Manufacturers

ASME BPVC-2025 SET Complete Set without Binders Includes all 33 volumes...







UNE-CEN ISO/TS 17444-2:2017 Electronic fee collection - Charging performance - Part 2: Examination framework (ISO/TS 17444-2:2017) (Endorsed by Asociación Española de Normalización in December of 2017.)
UNE 133927:1997 TRUNKED PRIVATE LAND MOBILE RADIO SYSTEMS. SPECIFICATIONS OF SIGNALLING OF THE SYSTEM.
ACC RC14001:2015Responsible Care 14001 Technical Specificationstandard by American Chemistry Council, 09/25/2015
UNE-ENV 1997-3:2002 Eurocode 7: Geotechnical design. Part 3: Design assisted by fieldtesting.
UNE-TBR 19:1999 EUROPEAN DIGITAL CELLULAR TELECOMMUNICATIONS SYSTEMS (PHASE 2). ATTACHMENT REQUIREMENTS FOR GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS (GSM) MOBILE STATIONS. ACCESS.
UNE-CEN/TR 15522-2:2006 Oil spill identification - Waterborne petroleum and petroleum products - Part 2: Analytical methodology and interpretation of results (Endorsed by AENOR in April of 2007.)
UNE-HD 622S1:1996/A2:2005 Power cables having rated voltages from 3,6/6 (7,2) kV up to and including 20,8/36 (42) kV with special fire performance for use in power stations (Endorsed by AENOR in October of 2005.)
Manual of Concrete Inspection: ACI 311.1R-07 with Selected References (Eleventh Edition)Book by American Concrete Institute, 02/01/2019
ICC CFC-20072007 California Fire Code, Title 24 Part 9, Includes supplements (2009)standard by International Code Council, 2008
NORSOK Z-015Temporary equipmentstandard by NORSOK, 10/24/2019
ICC CFC-20132013 California Fire Code, Title 24 Part 9standard by International Code Council, 2013California Building Standards Commission