Could I help you?
New Sale! View larger

ASTM E1548-09(2017)

New product

ASTM E1548-09(2017)

Standard Practice for Preparation of Aerospace Contamination Control Plans

More details

$20.21

-57%

$47.00

More info

1.1 This practice is intended to assist in the preparation of formal plans for contamination control, especially of aerospace critical surfaces. Requirements may be established at the systems level, either by the customer or the systems integrator, or at the subsystem level. Subsystem requirements may be imposed by the responsible subsystem supplier or they may be flowed down from the systems organization (4.7). The extent of detail and level of cleanliness required can vary with the particular application and type of hardware being built, but all aspects of contamination control must be included in a final plan. Therefore, each of the following elements must be considered for inclusion in a contamination control plan (CCP):

1.1.1 Cleanliness requirements  for deliverable hardware addressing particulate, molecular, or biological contaminants or combination thereof. Specify contamination limits and any budget allocations.

Author ASTM
Editor ASTM
Document type Standard
Format File
Confirmation date 2017-09-01
ICS 49.020 : Aircraft and space vehicles in
Number of pages 5
Replace ASTM E1548-09
Set ASTMVOL1503
Year 2009
Document history ASTM E1548-09
Country USA
Keyword ASTM 1548;ASTM E1548;ASTM E1548;10.1520/E1548-09R17