No products
View larger New product
1.1 This practice covers the procedures to be followed in the planning, site preparation, installation, testing and backfilling of underground vertical reinforced circular precast concrete manholes and components manufactured in accordance with Specification C478 (C478M) and used in sewer, drainage, and water works.
| Author | ASTM |
|---|---|
| Editor | ASTM |
| Document type | Standard |
| Format | File |
| ICS | 91.100.30 : Concrete and concrete products |
| Number of pages | 6 |
| Set | ASTMVOL0405 |
| Year | 2016 |
| Country | USA |
| Keyword | ASTM 1821;ASTM C1821;ASTM C1821;10.1520/C1821_C1821M-16 |