No products
View larger New product
1.1 This practice is a guide for removing specimens for built-up bituminous roof systems during application, but before the application of flood coating and top surfacing, for determining the approximate quantities of the components and the possible presence of moisture, or dry spots between plies, in the field. Components may consist of:
1.1.1 Insulation, when part of the roof membrane system,
| Author | ASTM |
|---|---|
| Editor | ASTM |
| Document type | Standard |
| Format | File |
| ICS | 91.100.50 : Binders. Sealing materials |
| Number of pages | 4 |
| Replace | ASTM D3617/D3617M-16 |
| Set | ASTMVOL0404 |
| Year | 2017 |
| Document history | ASTM D3617/D3617M-16 |
| Country | USA |
| Keyword | ASTM 3617;ASTM D3617;ASTM D3617;10.1520/D3617_D3617M-17 |