No products
View larger New product
1.1 This practice covers procedures, soils, and soil placement for the proper installation of corrugated steel pipe and pipe-arches produced to Specification A760/A760M or A762/A762M, in either trench or embankment installations. This practice also covers installation of corrugated steel pipe for alternative uses that do not involve backfilling or soil-structure interaction.
| Author | ASTM |
|---|---|
| Editor | ASTM |
| Document type | Standard |
| Format | File |
| ICS | 23.040.10 : Iron and steel pipes |
| Number of pages | 7 |
| Replace | ASTM A798/A798M-13 + Redline |
| Set | ASTMVOL0106 |
| Year | 2017 |
| Document history | ASTM A798/A798M-13 + Redline |
| Country | USA |
| Keyword | ASTM 798;ASTM A798;ASTM A798;10.1520/A0798_A0798M-17 |