Could I help you?
New Sale! View larger

IEC 61850-7-410 (2012-10)

New product

IEC 61850-7-410 (2012-10)

IEC 61850-7-410:2012 Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

More details

$131.15

-57%

$305.00

More info

IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

Author International Electrotechnical Commission (IEC)
Published by IEC
Document type Standard
Format File
Edition 2.0
ICS 33.200 : Telecontrol. Telemetering
Number of pages 122
Replace IEC 61850-7-410 CEI 61850-7-410
Cross references DIN EN 61850-7-410 (2013-10), IDT
Modified by IEC 61850-7-410 AMD 1 (2015-11)
Year 2012
Document history IEC 61850-7-410 (2012-10)
Country Switzerland
Keyword IEC61850;IEC 61850-7-410:2012