IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.
| Author | International Electrotechnical Commission (IEC) |
|---|---|
| Published by | IEC |
| Document type | Standard |
| Format | File |
| Edition | 2.0 |
| ICS | 33.200 : Telecontrol. Telemetering |
| Number of pages | 122 |
| Replace | IEC 61850-7-410 CEI 61850-7-410 |
| Cross references | DIN EN 61850-7-410 (2013-10), IDT |
| Modified by | IEC 61850-7-410 AMD 1 (2015-11) |
| Year | 2012 |
| Document history | IEC 61850-7-410 (2012-10) |
| Country | Switzerland |
| Keyword | IEC61850;IEC 61850-7-410:2012 |