IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
| Author | International Electrotechnical Commission (IEC) |
|---|---|
| Published by | IEC |
| Document type | Standard |
| Format | File |
| Edition | 2.0 |
| ICS | 25.040.40 : Industrial process measurement and control |
| Number of pages | 42 |
| Replace | IEC 62382 CEI 62382 |
| Cross references | DIN EN 62382 (2014-02), IDT |
| Year | 2012 |
| Document history | IEC 62382 (2012-11) |
| Country | Switzerland |
| Keyword | IEC62382;IEC 62382:2012 |