No products

BS PD CEN ISO/TR 20659‑2:2024 Rheological test methods. Fundamentals...

BS PD ISO/IEC TS 18013‑7:2024 Historical[ Withdrawn ] Personal...

BS PD ISO/TS 20790:2024 Oil and gas industries including lower carbon...

BS PD CEN ISO/TR 8124‑8:2024 Safety of toys - Age determination. First...

BS PD ISO/IEC TS 8236-2:2025 Information technology. Provisioning,...

BS PD CEN/TR 14380:2024 Lighting applications. Tunnel lighting standard...


BS PD CEN/TR 16389:2025 Automotive fuels. Paraffinic diesel fuel and...
CTI TP02-08aSuitability of Preservative-Treated Radiata Pine for Cooling Tower Constructionstandard by Cooling Technology Institute, 02/06/2002R.N. Wakeling, D.R. Page and M.J. Collins, Cooling tower Fabricators
CTI TP02-07New All Organic Chemistry for Treatment of Closed Cooling Systemsstandard by Cooling Technology Institute, 02/06/2002John Richardson and Michael G. Trulear, ChemTreat, Inc.
CTI TP02-08Suitability of Preservative-Treated Radiata Pine for Cooling Tower Constructionstandard by Cooling Technology Institute, 02/06/2002R.N. Wakeling, D.R. Page and M.J. Collins, Cooling tower Fabricators
CTI TP02-06Designed to Fail (Heat Exchanger Designs that Lead to Failure)standard by Cooling Technology Institute, 02/06/2002T.J. Tvedt, Jr., Puckorius and Associates, Inc.
CTI TP02-05Concrete Basins, Materials Selection in Design and Repairstandard by Cooling Technology Institute, 02/06/2002Thomas G. Toth, Psychrometrics Systems, Inc.
CTI TP02-04Anatomy of Enhanced Heat Exchanger Tubingstandard by Cooling Technology Institute, 02/06/2002Thomas M. Laronge, Thomas M. Laronge, Inc. and Mark A. Lisin, Lisin Metallurgical Services
CTI STD-202 (01)CTI Code Tower Standard Specifications for Standard for Publication of Custom Cooling Tower Thermal Performance Test Resultsstandard by Cooling Technology Institute, 03/01/2001
CTI TP01-01Water Reuse in Refineries, Chemical Plants, and Utilities: Experiences Throughout the USA and Texas - Guidelines and Case Historiesstandard by Cooling Technology Institute, 02/28/2001Paul R. Puckorius, Gary A. Loretitsch, Torry Tvedt, Puckorius and Associates, Inc.
CTI TP01-11Removal of Copper During Start-up of Cooling Towerstandard by Cooling Technology Institute, 02/28/2001Karen F. Pedraza, Dennis P. Shea, Solutia, Inc.
CTI TP01-10Hero Process - Recovery Reuse of Cooling Tower Blowdown and as a Preconcentrator for ZLD Applicationstandard by Cooling Technology Institute, 02/28/2001Charles H. Fritz, P.E., Black and Veatch Corporation & V.J. Nathan, Aquatech International Corporation
CTI TP01-09Extend the Life of Wetted Surfacesstandard by Cooling Technology Institute, 02/28/2001Mark A. Lisin, Lisin Metallurgical Services and Thomas M. Laronge, Thomas M. Laronge, Inc.
CTI TP01-08An Innovative Biodetergent for Fouling Controlstandard by Cooling Technology Institute, 02/28/2001F. Philip Yu, Mike G. Groshans, Nalco Chemical Company and Yu-Mei Lu, A.S. Huang, Taiwan Nalco Chemical Co., Ltd