Data is used to track parts usage; categorize failures; identify test failures; quantify instances of NFF (No Fault Found); document RTAT (Repair Turn-Around Time) and link repaired items back to removal from the end item.
DID DI-MGMT-82240 contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.
Product Details
Published: 08/14/2018 Number of Pages: 2 File Size: 1 file , 270 KB