Could I help you?
New Sale! View larger

IEC/TR 63191 (2018-11)

New product

IEC/TR 63191 (2018-11)

IEC TR 63191:2018 Demand side power quality management

More details

$131.15

-57%

$305.00

More info

IEC TR 63191:2018(E) specifies recommendations about power quality measurement and assessment within installations.
IEC TR 63191:2018 outlines the various phases needed for the establishment of a demand side power quality measurement plan for buildings and industry installations.
Such a power quality measurement plan will enable the optimization of the energy availability and efficiency, improve the assets lifetime and facilitate the resolutions of power quality problems. A power quality measurement plan encompasses the following stages:
•    definition of the context, objectives and constraints;
•    assessment of the initial power quality situation;
•    definition of an action plan for the improvement of the power quality situation;
•    implementation of the power quality measuring system;
•    exploitation of the measurement system for the improvement of the power quality situation;
•    maintenance of the measurement system.
IEC TR 63191:2018 will also help facility managers to tailor their measurement plan to the specific needs of the electrical system under their control. It addresses all the disturbances present in such networks, but does not cover the disturbances present in public electrical distribution networks (supply side) as they are governed by specific documents such as EN 50160 and IEC TS 62749.

Author IEC
Editor CEI
Document type Standard
Format File
Edition 1.0
ICS 33.200 : Telecontrol. Telemetering
Number of pages 79
Year 2018
Country International
Keyword IEC63191;IEC TR 63191:2018