CAMEE Best Practice Tool No. 1-1: Project Planning Guideline for Mechanical, Electrical, Plumbing & Fire Protection
Software by ASHRAE, 2013
In stock
This document is available as a free download (.pdf) to ASHRAE members. Visit www.ashrae.org/freeeptools.
This MEP/FP Project Planning Worksheet has been developed for engineering consulting firms that are engaged in the design of building systems (mechanical, electrical, plumbing, fire protection, telecom, etc.) The purpose of the Planning Worksheet is to serve as a platform to help engineering consulting firms develop internal processes that will strengthen the business-related aspects of their organizations.
Purchasers receive a worksheet in PDF format that may be printed for use.