No products

ASME BPVC-2025 SET Complete Set without Binders Includes all 33 volumes...







Viewed products
PO-86-01-3 -- Control of Supply Air...
PO-86-12-5 -- Summary of Calibrated Hot Box Text Results for Twenty-One Wall AssembliesConference Proceeding by ASHRAE, 1986M.G. Van Geem
PO-86-12-4 -- Heat-Transmission Coefficients for Metal Building SystemsConference Proceeding by ASHRAE, 1986M.K. Snyder
PO-86-12-3 -- Laboratory Measurement of Thermal Transmittance of Several Masonry Wall SystemsConference Proceeding by ASHRAE, 1986L.S. Shu, Ph.D.; R.D. Orlandi
PO-86-12-2 -- Heat-Transmission Tests on Sheet Steel WallsConference Proceeding by ASHRAE, 1986W.C. Brown
PO-86-12-1 -- Measurements of Energy Flows through Commercial Roof / Ceiling Insulation SystemsConference Proceeding by ASHRAE, 1986T.B. Broderick
PO-86-11-4 -- The Effect of Oil Contamination on the Nucleate Pool-Boiling Performance of R-114 from a Porous-Coated SurfaceConference Proceeding by ASHRAE, 1986A.S. Wanniarachchi, Ph.D.; P.J. Marto, Ph.D.; J.T. Reilly
PO-86-11-3 -- Augmentation of R-113 In-Tube Evaporation with Micro-Fin TubesConference Proceeding by ASHRAE, 1986J.C. Khanpara; A.E. Bergles, P.E., Ph.D.; M.B. Pate, P.E., Ph.D.
PO-86-11-1 -- Heat Transfer Augmentation in the Flueway of a Water HeaterConference Proceeding by ASHRAE, 1986C. Beckermann; V.W. Goidschmidt, Ph.D.
PO-86-10-3 -- Building Commissioning: What If You Want to Skip It?Conference Proceeding by ASHRAE, 1986K.M. Elovitz, P.E.
PO-86-10-2 -- Building Commissioning: A Contractor's ViewpointConference Proceeding by ASHRAE, 1986J.T. Prince, P.E.
PO-86-09-4 -- The Effect of Hard Water Scale Buildup and Water Treatment on Residential Water Heater PerformanceConference Proceeding by ASHRAE, 1986S.G. Talbert; G.H. Stickford; D.C. Newman; W.N. Stiegelmeyer
PO-86-09-3 -- Combination Water-Heating/Space-Heating Appliance PerformanceConference Proceeding by ASHRAE, 1986B.R. Subherwal, P.E.