No products
Viewed products
BS ISO 16814:2008 Building...
AWWA C518-18...
SME MS96-135Computer Aided Process Planning System For Block Assemblystandard by Society of Manufacturing Engineers, 06/01/1996Kyu Kab Cho ; Kwang Ryel Ryu ; Jeong Soo Oh ; Hyung Rim Choi ; Sung Tae Yun
SME MS96-134Intelligent Scheduling And Control Of Flexible Manufacturing Systemsstandard by Society of Manufacturing Engineers, 06/01/1996F. Frank Chen ; D. Wu ; Robert R. Henry
SME MS96-133Use Of A Reprocessability Index System For The Environmental Scoring Of Rotational Partsstandard by Society of Manufacturing Engineers, 06/01/1996Christopher J. Wentland ; John W. Sutherland ; Walter W. Olson
SME MS96-132Disassembly Model For Recycling-Personal Computerstandard by Society of Manufacturing Engineers, 06/01/1996Hong C. Zhang ; Tsai-Chi Kuo
SME MS96-131A Pretravel Model For Touch Trigger Probes With Straight Styli, Part Ii: Horizontal Probesstandard by Society of Manufacturing Engineers, 06/01/1996Yin-Lin Shen ; Xianping Zhang
SME MS96-130A Pretravel Model For Touch Trigger Probes With Straight Styli, Part I: Vertical Probesstandard by Society of Manufacturing Engineers, 06/01/1996Yin-Lin Shen ; Xianping Zhang
SME MS96-129A Framework For Production Planning And Control In A Virtual Okp Companystandard by Society of Manufacturing Engineers, 06/01/1996Yiliu Tu
SME MS95-151Developing An Integrated Framework For The Design Of Manufacturing Systems Using Thestandard by Society of Manufacturing Engineers, 06/01/1995Rao, Harish A. ; Gu, P.
SME MS95-220The Paradigm Changestandard by Society of Manufacturing Engineers, 06/01/1995Olling, Gustav J.
SME MS95-152On-Line System Identification And Control Of A Thick Film Printing Process Using Neural Networkstandard by Society of Manufacturing Engineers, 06/01/1995Bose, Subhash C. ; Balderas, Roberto A.
SME MS95-109Design Of Plant Floor Control Systems With Standard Hardware And Off-The-Shelf Softwarestandard by Society of Manufacturing Engineers, 06/01/1995Rao, Bappanadu N.
SME MS95-108Common Misconceptions And Blunders In Implementing Quick Response Manufacturingstandard by Society of Manufacturing Engineers, 06/01/1995Suri, Rajan